logo-XTronica-e1490359598117
Norwegian
English
+47 73 79 72 90
info@xtronica.no
  • HOME
  • ABOUT
    • Company Introduction
    • Certificates
  • SOLUTIONS
    • Fluid Control & Management
      • CControl System
      • Tank Gauging System
      • Remote Valve Control System
      • Anti-Heeling System
      • High/High High Level Alarm System
      • Water Ingress System
      • Emergency Shutdown System
    • Ship/Offshore Platform Performance Monitoring
      • Loading Computer
      • Hull Stress Monitoring System
      • Power & Fuel Consumption Monitoring System
      • Reefer Container Monitoring System
      • Shaft Power Meter
      • Electric Inclinometer
      • Electrical Optic Deflection/Torque Monitoring System
      • Roll Damping System
    • Cloud IoT Service
    • Cyber Security Platform
  • NEW ENERGY
    • Marine Battery Power Supply System
      • Containerized Battery Power Supply Module
  • SPARE PARTS
    • Level Gauges & Sensors
    • Actuators & Hydraulic Hand Pumps
    • Others
      • Valve Position Indicator
      • IO
  • NEWS
  • WORLDWIDE AGENCY
  • CONTACT US
  • JOBS

Blog

Home NEWS Aegean Shipping’s 114,000 DWT Crude Carrier “GREEN ADMIRE” was successfully delivered
Aegean Shipping’s 114,000 DWT Crude Carrier “GREEN ADMIRE” was successfully delivered
2022-06-25yancy dai

165630495773918519 300x200

On June 24, 2022, the 114,000 DWT Crude Carrier “GREEN ADMIRE” customized by Aegean Shipping was successfully delivered at COSCO SHIPPING HEAVY INDUSTRY(YANGZHOU) CO.,LTD.

XTronica provided UNIVERSE SHIP SHORE LINK EMERGENCY SHUTDOWN SYSTEM for this vessel. The classification society of this vessel is BV.

Previous post New contracts at Sletta Verft, Norway Next post ASEAN SEAS LINE CO., LIMITED “ASL HONG KONG” was successfully delivered

News

  • Electrical Optic Deflection Monitoring System for Taiwan Navy’s new auxiliary repair dock completed the factory acceptance test successfully
  • XTronica AS Receives DNV Type Approval For Cyber Security Platform
  • XTronica AS General Cyber Security Platform XT-CSP DNV Type Approval
  • 5000-Ton self-propelled full-rotation crane vessel was successfully delivered
  • China’s first 16,000m³ methanol bunkering vessel was successfully delivered

Copyright © 2025 Xtronica AS All Rights Reserved.